Place of Origin:
CHINA
Brand Name:
RUIDEER
Certification:
CE/ISO
Model Number:
Z1000
Ruideer has been awarded honorary titles such as National High-Tech Enterprise, National Specialized and Sophisticated "Little Giant" Enterprise, National Manufacturing Single Champion Product (Pressure Sintering Furnace), and National Green Factory. The company has passed ISO9001 quality management system certification, environmental management system certification, occupational health and safety management certification, intellectual property management standards certification, and CE certification, among others. It possesses 130 authorized intellectual property rights, including 15 domestic invention patents and 4 international invention patents.
Packaging Advantage: The furnace adopts a modular design, which is easy to disassemble for packing and container loading, reducing the risk of equipment damage during overseas export.
Technical Parameters:
|
Design Temperature (℃) |
1100℃ |
|
Max. Working Temperature (°C) |
1050℃ |
|
Ultimate Vacuum (Pa) |
5Pa(Clean, dry, cold, and empty furnace status) |
|
Heating Method |
Graphite resistance type |
|
Zinc Penetration Rate |
≥95% |
|
Zinc Residue |
≤20ppm |
|
Cooling Time |
8-10 h (Cooling time from sintering temperature of 1050°C down to 100°C. Water temperature ≤26°C, 2 bar ≤ water pressure ≤ 3 bar, water flow rate 30-40 m³/h) |
After-sales Service
Warranty period:
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions wthin 2 hours, after receiving thebuyer's notification If it is need to go to the site for treatment, operators dispatched by seller should arrive at the sitewithin 48 hours after go aboard. In case of emergency.operators should arrive at the site within 48 hours after go aboard.and continue to make repairs until the fault is removed and the equipment returns to normal.
The Seller shall train the Buyer's personnel during the acceptance inspection. When the equipment is installed and commissioned at the Buyer's site, the Buyer's operation and maintenance personnel shall assist the Seller's personnel in the installation and commissioning work, and undergo practical operation and maintenance training. The Seller's
technical personnel shall explain the basic principles of the equipment, maintenance knowledge, and handling measures for common faults.
Send your inquiry directly to us