Place of Origin:
China
Brand Name:
Ruideer
Certification:
ISO CE
Model Number:
336/4412/5518
Chinese Supplier Tungsten carbide High Temperature Gas Pressure Sintering Furnace 1-20MPA
Zhuzhou Ruideer Intelligent Thermal Equipment Co.,Ltd located in Ruideer Technology Park,Tianyuan District,Zhuzhou Hunan Province,founded in 2011,covering an area of more than 19,000 square meters.
At present,Ruideer has developed two core technologies of “high temperature &high pressure”and “chemical vapor deposition” with supplying vacuum sintering furnace and CVD coating furnace.
Our main products including:GPS furnace,MIM vacuum sintering furnace,ceramic silicon carbide/nitride sintering furnace,silicon carbide coating furnace,cemented carbide cutting tool CVD coating furnace and the turnkey solution for the cemented carbide cutting tool(From RDP powder,press machine,sinter furnace,cuuting machine,laser machine,metalgraphic testing instruments,sandblasting matchine,ultrosonic cleaning machine to CVD coating furnace).
The Gas Pressure Sintering Furnace(GPS furnace) has been awarded National Manufacturing Champion Product,widily used in cemented carbide,non-cermets,semiconductor,aerospace,automobile manufacturing,weapons and other fields,exported to the US,Russia,Japan,EU,Ukraine,South Korea,Vietnam and other countries,which making Ruideer a well-known brand in the industry.
The main parameters for the equipment:
Furnace Type | Horizontal type(Max Working pressure:58bar/98bar | |||
RDE-3312-6 | RDE-4412-6 | RDE-5512-6 | RDE-5518-6 | |
Usable Space (W*H*L) | 300*300*1200mm | 400*400*1200mm | 500*500*1200mm | 500*500*1800mm |
Max.Charge Load | 300kg | 500kg | 1200kg | 1500kg |
Power Rating | 320KVA | 320KVA | 430KVA | 600KVA |
Heating Zone | 2/3 Zones | 3 Zones | 3 Zones | 3 /4 Zones |
Cooling time | ≤5h | ≤6h | ≤7h | ≤8h |
Empty furnace, cooling from sintering temperature 2100℃ to 100℃. (water temperature≤26℃, water pressure 2-3bar, 55bar(95bar)≤Ar pressure≤58bar(98bar). |
||||
Service Life | 20years/6000furnace cycles | |||
Max. Working Temp | 1650℃ | |||
Temperature Measurement | Special design High temperature W-Re5/26 Thermocouple | |||
Max Vacuum Degree | 1Pa (under cold, empty, dry furnace) | |||
Leakage Rate | 3Pa/h (Average value under cold, empty, dry furnace) | |||
Input gas | N2, Ar, | |||
Functions |
Automatic Positive Pressure, Negative Pressure Leak Detection Vacuum Sintering Partial Pressure Sintering (Static, Dynamic) Pressure Sintering Rapid Cooling Fully-automatic control & Safety interlock& Breakpoint continuing heating & Wireless remote control& Self-diagnosis
|
Problems in the sintering process of cemented carbide tools.
1. Excessive carbon in the alloy, i.e. the cobalt magnetism of the mixture itself is high or even carburized, carbon in carbon paper is absorbed, residual paraffin is cracked, and the insulation layer absorbs paraffin, resulting in a high concentration of carbon atmosphere, etc.
2. Insufficient carbon in the alloy, i.e. the cobalt magnetism of the mixture itself is low, the pressed product is stored for too long, the furnace leaks, the contact material is used incorrectly, etc.
3. High concentration of carbon-containing gas enters the weak parts of the product (the edges and corners of the product are often low in density or have severe elastic aftereffect), and under the contact of cobalt, a carbon precipitation reaction occurs. The precipitated carbon destroys the continuity of the alloy, causing the alloy to "peel"
4. The density of the pressed product is uneven; the carbon content in different parts of the sintered body is different; the boat is uneven, the sintering atmosphere is uneven, and the sintering temperature is uneven
5. Overburning - the sintering temperature is too high; there are oxides in the pressed green sheet that are difficult to reduce, and they can only be reduced at a higher temperature after the liquid phase appears. The pressure of the gas generated by the reduction is greater than the resistance of the liquid phase contraction; the debris in the pressed green sheet, such as alloy debris, iron filings, copper wire, etc.
6. The gas generated by the reduction of oxide impurities at high temperature or the furnace gas entering the sintered body, when the alloy solidifies, it does not have time to escape, and it is dispersed and remains in the alloy, and the pressure of the gas is not enough to form bubbles and become holes
7. The gas generated by the reduction of oxide impurities at high temperature or the furnace gas entering the sintered body, when the alloy solidifies, it does not have time to escape, and it is dispersed and remains in the alloy, and the pressure of the gas is not enough to form bubbles and become holes.
More about differences between Sinter HIP Furnace and Gas Pressure Sintering Furnace
Main functions description:
Equipment strengths:
Documents of Equipment and Technical Files
Design standards
The equipment is designed in accordance with the pressure vessel requirements of the Quality and Technical Supervision Bureau, and is qualified after pressure testing and shipped. The electrical design and construction meet national standards.
Horizontal and vertical options are available:
Installation pre-test and pre-acceptance
The equipment is fully assembled in our factory, including all pipelines, vacuum pipelines, process gas pipelines, cooling water pipelines, compressed air pipelines, etc. Pre-testing can be carried out after installation. At the customer site, pipelines other than the equipment are provided by the customer. The installation also includes the connection of all cables. At the customer site, the main cable connecting the power cabinet is provided by the customer. After installation, we conduct vacuum and positive pressure leakage tests on the entire equipment, as well as mechanical and electrical function tests.
Disassembly and transportation
The equipment will be disassembled in several large parts, packed in a standardized wooden cases, and loaded into the transport vehicle.
Customer site installation and commissioning
The Redeer after-sales engineer will lead the team to complete commissioning, product trial burning and other work within 20 working days. The customer needs to make appropriate preparations and provide the necessary tools, such as hoisting and lifting equipment. And provide installation personnel support (it is recommended to have 1 mechanical personnel and 1 electrical personnel).
Final acceptance
After installation and commissioning, the equipment can be finally accepted in accordance with the requirements of the technical contract.
Training
Our after-sales engineers will provide a systematic and complete on-site training, including operation, maintenance, troubleshooting, etc.
Technical data delivery
To ensure safe operation and equipment maintenance, the following technical data will be provided to customers:
1. Equipment installation layout
2. User manual
3. Spare parts list
4. Electrical drawings
5. Component manual
FAQ
A:We are China leading high-temperature vacuum furnace manufacturer with over 15 years’ experience.
A:Yes,we have powerful R&D team and high-tech equipment.So we can not only supply the regular model,but also the customizable furnace as the repuirment of our clients.
Q:What's your advantage?
A:
l Quick response to your enquiry
l High quality control
l Stable supply chain
l Timely delivery
l Excellent after-sales service
Send your inquiry directly to us