Place of Origin:
China
Brand Name:
Ruideer
Certification:
CE
Model Number:
336/4412/5518
White pressure sintering /rapid cooling sinter/single chamber hip furnace
This HIP sintering furnace is suitable for, but not limited to, cemented carbide products, high magnetic products, cermet products, ceramic products and other powder metallurgy products.
Equipment Function:
• Furnace positive pressure leak detection
• Positive pressure leak detection of dewaxing system
• Furnace negative pressure leak detection
• Argon negative pressure dewaxing
• Positive pressure dewaxing
• Vacuum sintering
• Partial pressure sintering
[Including: continuous partial pressure sintering, intermittent partial pressure sintering, static partial pressure sintering]
• Vacuum cooling
[Including: continuous partial pressure cooling, intermittent partial pressure cooling, static partial pressure cooling,vacuum cooling]
• Rapid cooling
Equipment System:
• Electrical control system
• Heating system
• Dewaxing system
• Vacuum system
• Cooling water system
• Rapid cooling system
• Security system
• Auxiliary system
Shipping and Service:
• Design standards
The equipment is designed in accordance with the pressure vessel requirements of the Quality and Technical Supervision Bureau, and is qualified after pressure testing and shipped. The electrical design and construction meet national standards.
• Installation pre-test and pre-acceptance
The equipment is fully assembled in our factory, including all pipelines, vacuum pipelines, process gas pipelines, cooling water pipelines, compressed air pipelines, etc. Pre-testing can be carried out after installation. At the customer site, pipelines other than the equipment are provided by the customer. The installation also includes the connection of all cables. At the customer site, the main cable connecting the power cabinet is provided by the customer. After installation, we conduct vacuum and positive pressure leakage tests on the entire equipment, as well as mechanical and electrical function tests.
• Disassembly and transportation
The equipment will be disassembled in several large parts, packed in a standardized manner, and loaded into the transport vehicle.
• Customer site installation and commissioning
The Redel after-sales engineer will lead the team to complete commissioning, product trial burning and other work within 20 working days. The customer needs to make appropriate preparations and provide the necessary tools, such as hoisting and lifting equipment. And provide installation personnel support (it is recommended to have 1 mechanical personnel and 1 electrical personnel).
• Final acceptance
After installation and commissioning, the equipment can be finally accepted in accordance with the requirements of the technical contract.
• Training
Our after-sales engineers will provide a systematic and complete on-site training, including operation, maintenance, troubleshooting, etc.
• Technical data delivery
To ensure safe operation and equipment maintenance, the following technical data will be provided to customers:
1. Equipment installation layout
2. User manual
3. Spare parts list
4. Electrical drawings
5. Component manual
Send your inquiry directly to us