Place of Origin:
China
Brand Name:
Ruideer
Certification:
CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Model Number:
300mm*300mm*1200mm
300*300*1200-6MPA sinter-HIP furnace especially for high-performance cemented carbide materials
Main application
For mass production of high-performance cemented carbide materials which gathered dewaxing (It can realize vacuum dewaxing,H2 dewaxing,binder can be paraffin or PEG),Vacuum sintering,Low pressure Argon dynamic partial pressure sintering,High pressure Argon sintering,cooling,heat preservation and heating up under high temperature high pressure status.
General structure
This kind of vacuum pressure sintering furnace for cemented carbide research, which is single room , horizontal type , recycle heating furnace,it adopt graphite heating element of low voltage and large current .All the technical process is automatic controlled,monitored,chased,fault diagnosed which showed and recorded by computer.
Design standard:20-year service life,double doors horizontal structure,6000 times.
Technical indexes
Service life | 6000times / 20-years service life |
Useful space | 300mm*300mm*1200mm |
Max. Loading weight | 120kg(According to Sinter products and loading space) |
Max. Designed Temp. |
1600℃(Heating temperature) |
Max. Working temp. | 1550℃ |
Max. working pressure
|
58bar |
Ultimate vacuum degree | 1pa(After heating,cold,empty,dry condition) |
Pumping speed | The vacuum degree up to 5 pa within 30min after starting pump,the vacuum degree can get to 3pa after pumping continually within 30min,(after empty sintering,in empty,clean,cold condition) |
Leakage rate (In average24h) | 3pa/h(After testing ultimate vacuum,under empty cold,clean condition,test in average 24h) |
Wax-collection rate | ≥98% (Argon or Nitrogen dewaxing with 10kg wax absolutely, average not more than 3 times ) |
Max. Ramp up rate |
8℃/min(Room temperature ramp up to 1450℃ in vacuum,empty loaded condition,can be soaked in process when 600℃,1000℃ and 1200℃; ≤5℃/min when Fully loaded. |
Pressurized time | ≤20min Can be set(When Gas source keep around 130bar,pressurized to required pressure) |
Cooling time | ≤3 hours( From 1450℃ drop to 100℃ when fully-loaded,water temperature≤30℃,90bar≤ pressure≤98bar ) |
UPS time | Supply power to indicator and to control furnace when power-off, Keeping time≥60min |
After sales:
1. Installation, Commissioning and Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2. Training
When taking-over the Furnace to the customer,we will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
Send your inquiry directly to us