Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing

Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing

  • High Light

    6 MPa Sinter HIP Furnace

    ,

    Carbide Dewaxing Sinter HIP Furnace

    ,

    Sinter Hot Isostatic Pressing Furnace

  • Service Life
    20 Years
  • Effective Working Zone
    350*350*1200
  • Warranty
    1 Year
  • After Sales
    Engineer Can Be Dispached To Foreign Country To Finish The Installation And Commissioning Work
  • Painting
    Black,white,gray,blue,green
  • Heating Power
    320KVA
  • Place of Origin
    China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
  • Model Number
    350*350*1200mm
  • Minimum Order Quantity
    1 set
  • Price
    Negotiable
  • Packaging Details
    Exempted from inspection wooden case
  • Delivery Time
    100-120 work days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    8 sets/month

Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing

 

350*350*1200-6 MPa sinter-HIP furnace with a single chamber and double door horizontal and periodic heating structure

 

Equipment system:
It mainly includes control system, heating system, positive and negative pressure dewaxing system, vacuum system, pressure sintering system, cooling water system, rapid cooling system, safety system and auxiliary system.

 

 

Design standards:

The cemented carbide pressure sintering furnace is a single chamber and double door horizontal and periodic heating structure,which is designed for easy handling and maintenance, the whole process is controlled automatically.It can realize full load continuous operation, 300 furnace times/year or 300 working days/year.It uses graphite element resistance heating (low voltage, high current) .In addition, there are multiple heating units, each of which controls the temperature separately.It equipped with fully automatic control function and safety interlock function.The whole process is automatically controlled, monitored, tracked and recorded by computer.The PLC, industrial computer (PC) control to realize the whole process of one-key start, real-time dynamic monitoring, computer will save temperature, pressure, vacuum and other parameters ,alarm interlocking is safe and reliable.

 

 

General equipment requirements:
The equipment is mainly used for dewaxing of cemented carbide (vacuum Ar carrier gas dewaxing and hydrogen micro-positive pressure dewaxing), vacuum sintering, partial pressure sintering, pressure sintering, rapid cooling and other processes.It meets the strict requirement of uniformity of furnace temperature and atmosphere in sintering process of cemented carbide.

 

 

 

 

Technical parameters of equipment

Service life of furnace shell

20 years service life

Furnace shell working time

6000 (furnace/time)

Effective working zone size

350mm×350mm×1200mm

Max.loading weight

500kg

 

Maximum design temperature

1600℃(Under vacuum sintering conditions,drying the furnace 1600℃)

Maximum working temperature

1500℃

(Under the vacuum and pressure condition.)

Maximum design pressure

60bar

Maximum working pressure

58bar

 

Pumping speed

 

The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

(After drying the furnace,under the empty furnace, clean and cold state)

 

 

Leakage rate

 

 

≤3Pa/h

(Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test.Average within 3 hours in empty furnace, clean and cold state)

 

 

 

Cooling time of loading full furnace

 

 

 

When the furnace is fully loaded,the cooling time of sintering temperature from 1450℃ to 100℃ is less than or equal to 6 hours(water temperature ≤30℃,55bar≤pressure≤58bar)

 

 

 

 

Filling high pressure argon gas

 

It adopts intermittent stable inflation, inflation time can be set.The system accurately matches the relationship between charging volume and time to ensure the following of charging.

 

 

Wax collecting rate

 

≥98%(10kg paraffin refined wax ,Ar negative pressure dewaxing ,three averages at most

 

 

Pressurization time

 

 

The pressurization time to 58Bar is less than 20 minutes,which can be set.(The gas resource is stable in the range of 80bar-100bar)

 

 

 

Double Door 6 MPa Sinter HIP Furnace For Cemented Carbide Dewaxing 0

After sales:

1.Installation, Commissioning And Acceptance

We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.

The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.

 

2.Training

When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)

 

3. Warranty period

The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.