Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Single Chamber 3312 Sinter HIP Furnace With Rapid Cooling Function

Single Chamber 3312 Sinter HIP Furnace With Rapid Cooling Function

  • High Light

    Single Chamber Sinter HIP Furnace

    ,

    3312 Sinter HIP Furnace

    ,

    Rapid Cooling Sinter HIP Furnace

  • Heating Material
    Graphite
  • Warranty
    12 Months
  • Weight
    2~20T
  • Voltage
    Based On User Requirements
  • Dimension(l*w*h)
    300*300*1200
  • Structure
    Single Chamber,horizental Type
  • Place of Origin
    China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
  • Model Number
    300*300*1200
  • Minimum Order Quantity
    1 set
  • Price
    Negotiable
  • Packaging Details
    Exempted from inspection wooden case
  • Delivery Time
    100-120 work days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    6 sets/month

Single Chamber 3312 Sinter HIP Furnace With Rapid Cooling Function

3312sinter-HIP furnace integrated negative pressure debinding,vacuum sintering,rapid cooling functions

 

3312 sinter-HIP furnace

 

Application:

Used for debinding of high performance cemented carbide materials.It can realize negative pressure dewaxing process (forming agent is paraffin), vacuum sintering, partial pressure sintering, pressure sintering, rapid cooling and other batch production operations and research and development operations in the laboratory.It can sintering carbide blades, ceramic blades, extruded bar products and special-shaped products and other powder metallurgy products.

 

Technical parameter:

Type ZZRDE-SINTER-HIP FURNSCE5512
Effective working zone(mm) 300×300×1200
Maximum loading weight 250KGS
Heating power 300KVA
Max.design pressure 0.6MPa
Max.working pressure 0.6MPa
Max.design temperature 1600℃
Max.working temperature 1500℃
Temperature control mode 3 zone temperature control
High temperature uniformity ≤±5℃

Max.heating up speed

(empty furnace)

15℃/min(≤1000℃);
10℃/min(1000-1520℃)
Ultimate vacuum degree ≤4 Pa
Vacuum leakage rate  ≤4 Pa /h
Wax yield rate ≥98﹪(paraffin)

 

 

Single Chamber 3312 Sinter HIP Furnace With Rapid Cooling Function 0

 

 

After sales:

1.Installation, Commissioning And Acceptance

We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.

The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.

 

2.Training

When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,
and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)

 

3. Warranty period

The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.