Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
5512 Sintering Pressurized Furnace For Cemented Carbide

5512 Sintering Pressurized Furnace For Cemented Carbide

  • High Light

    Sintering Pressurized Furnace

    ,

    5512 Pressurized Furnace

    ,

    Cemented Carbide Sinter HIP Furnace

  • Certification
    CE,ISO
  • Max Temperature
    1600℃
  • Structure
    Horizontal Type
  • Painting
    Black,white,gray,blue,green
  • Temperature Uniformity
    ±5 ℃
  • Vacuum System
    Made In China ;Leybold
  • Place of Origin
    Zhuzhou City, Hunan Province,China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
  • Model Number
    500*500*1200
  • Minimum Order Quantity
    1 set
  • Price
    Negotiable
  • Packaging Details
    Exempted from inspection wooden case
  • Delivery Time
    120-150work days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    8 sets/month

5512 Sintering Pressurized Furnace For Cemented Carbide

5512 sintering pressurized furnace(it can reach the sinteing of cemented carbide,ceramics and so on)

 

Profile of sinter-HIP furnace:

The ZZRDE company's pressurized sintering furnace series integrates the functions of positive pressure dewaxing, vacuum dewaxing, vacuum sintering, Tovac sintering, partial pressure sintering, pressure sintering, atmosphere control, cooling and so on.
In order to meet different process requirements, Ar, H2, CH4, N2 and other gases or gas combinations can be imported under different pressures and temperatures.
Horizontal design makes loading, unloading and maintenance easier.The whole process is automatically controlled.

 

Technical parameter:

Type ZZRDE-SINTER-HIP FURNSCE5512
Effective working zone(mm) 500×500×1200
Maximum loading weight 1000KGS
Heating power 410KVA
Max.design pressure 10MPa
Max.working pressure 9.50MPa
Max.design temperature 1600℃
Max.working temperature 1550℃
Temperature control mode 3 zone temperature control
High temperature uniformity ≤±5℃

Max.heating up speed

(empty furnace)

15℃/min(≤1000℃);
10℃/min(1000-1520℃)
Ultimate vacuum degree In cooling,empty and clean furnace chamber≤ 2Pa
Vacuum leakage rate In cooling,empty and clean furnace chamber≤ 2Pa/h
Wax yield rate ≥98﹪(paraffin)

 

 

 

5512 Sintering Pressurized Furnace For Cemented Carbide 0

 

 

After sales:

1.Installation, Commissioning And Acceptance

We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.

The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.

 

2.Training

When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,
and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)

 

3. Warranty period

The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.