Carbide production line

Other Videos
January 20, 2026
Category Connection: Gas Pressure Sintering Furnace
Brief: This video provides a comprehensive walkthrough of our complete turn-key project for producing cemented carbide cutting tools. You will see a detailed demonstration of the entire production line, from powder preparation and pressing to sintering in our intelligent Gas Pressure Sintering Furnace and final coating. Discover how our integrated solution ensures high-quality tool manufacturing with advanced automation and smart monitoring capabilities.
Related Product Features:
  • Complete production line from powder preparation to final coating and testing for cemented carbide cutting tools.
  • Intelligent Gas Pressure Sintering Furnace with mobile monitoring and one-key automated operation.
  • Advanced chemical vapor deposition (CVD) coating furnace for enhanced tool wear resistance.
  • Precision pressing equipment with CNC control for consistent insert forming.
  • Comprehensive quality control with metallographic testing instruments and cutting performance verification.
  • Rapid installation and commissioning completed within 20 days with full technical support.
  • Global after-sales service with 24/7 support and on-site maintenance within 12 hours for urgent cases.
  • Customizable solutions with powerful R&D support for specific client requirements.
FAQs:
  • Are you a factory or a trading company?
    We are a leading high-temperature vacuum furnace manufacturer in China with over 15 years of experience, directly producing the equipment.
  • Do you offer customization or OEM services for the furnace equipment?
    Yes, we have a powerful R&D team and advanced equipment, allowing us to provide both standard models and fully customizable furnaces based on client requirements.
  • What are the main advantages of your turn-key carbide production solution?
    Our advantages include quick response to enquiries, high-quality control, a stable supply chain, timely delivery, and excellent after-sales service with 24/7 support.
  • How long does it take to install and commission the production line?
    Under normal conditions with utilities ready, installation, debugging, and production can be completed within 20 days.
Related Videos