Place of Origin:
CHINA
Brand Name:
RUIDEER
Certification:
CE/ISO
Integrated Furnace :
It is capable of vacuum/atmosphere sintering to produce specimens in the form of discs, blocks, cylinders, etc. With the use of complex forming dies, it can also process hot-pressed parts of intricate shapes. The furnace consists of a shell, heating elements, insulation layer, pressing device, vacuum system, cooling system, and electrical control system, with side-door opening and side-loading. It features two independently movable pressing rams, allowing flexible combinations of pressing modes.
Technical Paraneter:
| Design temperature (℃) | 2200 |
| Pump set | Sliding-vane pump + Roots pump + Oil diffusion pump |
| Process gas | N₂ / Ar |
|
Temperature uniformity (℃) |
±5 |
|
Pressure rise rate (Pa/h) |
≤3 |
|
Hydraulic mechanism |
Two-beam four-column structure |
|
Loading capacity (kg) |
500kg |
|
Press tonnage (t) |
≤500 |
|
Pressure fluctuation (t) |
≤1.5t |
|
Upper ram stroke (mm) |
150 |
After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,
and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
Send your inquiry directly to us