Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Great Performance Gas Pressure Vacuum Dewaxing Sintering Furnace 2200 C

Great Performance Gas Pressure Vacuum Dewaxing Sintering Furnace 2200 C

  • High Light

    Gas Pressure Vacuum Sintering Furnace

    ,

    Gas Pressure Dewaxing Sintering Furnace

    ,

    Gas Pressure Sintering Furnace 2200C

  • Color
    White, Gray, Black, Blue
  • Warranty
    One Year
  • Chamber Size
    Customizable
  • After-sales Service
    Online Service
  • Material
    Carbon Steel. Stainless Steel
  • Heating Rate
    80-480KVA
  • Place of Origin
    China
  • Brand Name
    Ruideer
  • Certification
    CE certificate, GB150, JB4732
  • Model Number
    Customizable
  • Minimum Order Quantity
    1 set
  • Price
    USD 93,000-77,000,000
  • Packaging Details
    Special wooden box
  • Delivery Time
    5-8 months
  • Payment Terms
    L/C, T/T
  • Supply Ability
    7 sets / month

Great Performance Gas Pressure Vacuum Dewaxing Sintering Furnace 2200 C

Great Performance Gas Pressure Vacuum Dewaxing Sintering Furnace 2200 C

Applications: for cemented carbide, precision ceramic, stainless steel

 

Functions: Vacuum sintering, Gas pressure sintering, H2 dewaxing, vacuum heating, heating with gas mixture( CH4/H2), heating flowing gas, rapid cooling.

 

 

Technical parameters:

Valid working space(W*H*L)

400mm×400mm×1200mm

Design Pressure

60bar

Working Pressure

58bar

Pressuring time

Less than 20 min. (up to 58 bar, air source pressure is between 80bar-100bar)

Cooling speed

 

≤7h(empty furnace,from 1450℃ cooling down to 100℃, water temperature≤26℃,55 bar≤Ar pressure≤58 bar)

Max.loading weight

500Kg(The load capacity depends on the product type)

Heating power

320KVA

Design service life

of the furnace shell

20 years

Max. Design Temp.

1600℃(under vacuum sintering)

Max. Working Temp.

1550℃(under vacuum and gas preesure condition)

Pumping speed

The vacuum degree can reach 5Pa within 30min after starting the pump. After reaching 5Pa and then pumping for 60min, the ultimate vacuum value reaches 1Pa (within a cold, empty and clean furnace that has been dried before).

Leakage rate

≤3Pa/h (stop the pump group operation and start checking after testing the limit vacuum (within a cold, empty and clean furnace that has been dried before).

 

High pressure Ar gas filling

 

It adopts intermittent and stable inflation, and the inflation time can be set. The system accurately matches the relationship between inflation volume and time to ensure the followability of inflation.

 

Wax Collection Rate

 

≥98%(10Kg pure paraffin, argon negative pressure dewaxing. Measured by three times of mean values at most).

 

UPS guarantee time

 

It can power the indicator light and control the furnace during power outage for more than 80 minutes.

 

Max.heating rate

 

≤8℃/min ( full load, half-way insulation is allowed)

 

Hot zone temp. uniformity

 

In the process of vacuum and pressure sintering, the temperature uniformity of pressure (58bar) is 1450℃: high pressure gas is filled at the maximum allowable speed, and the temperature fluctuation of thermocouple is ≤±5℃.