Place of Origin:
China
Brand Name:
Ruideer
Certification:
CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Model Number:
Customizable
Easy Operation Highly Automatic Dewaxing Sintering Furnace
Main system function:
Main including control system,heating system,positive and negative pressure debinding system,vacuum system,rapid cooling system,safety system and auxiliary system.
Application:
Mainly used for hard alloy, ceramics, semi-conductor dewaxing (Ar carrier gas dewaxing and continuous and pulse hydrogen micro-positive pressure dewaxing), vacuum sintering, pressure separation sintering, rapid cooling and other processes.The above process can be continuously treated.
It can meet the strict requirements on furnace temperature uniformity and atmosphere uniformity of cemented carbide in sintering process, the furnace structure design is advanced and reasonable, easy to use and maintain. The main supporting components (control components, sensors, graphite heater, thermocouple, main control valve, vacuum pump, etc.) have the international advanced level, can adapt to long-term, stable, reliable mass production requirements.At the same time, the equipment meets the national requirements of energy conservation and environmental protection.
Working environment:
1. Humidity and temperature requirement:
1.1 Humidity: <90%(at 35℃)
1.2Temperature:0~+45℃
2. Power supply:
2.1Motive power supply:375~430V,50Hz,3 phase 5 wire system
2.2 Control power supply:210~250V,50Hz,Single-phase
3. Water: Fully enclosed circulating water
4. Gas:
Input gas allowed: Ar,H2,N2
Technical parameters:
Service life
|
6000times / 20-years service life |
Useful space | 300×300×600mm |
Max. Loading weight
|
≥200kg
|
Max. Designed temperature | 1600℃ |
Max. Working temperature
|
1550℃
|
Max. working pressure
|
≤60bar
|
Ultimate vacuum degree
|
5*10-2mbar
|
Wax collection rate | 98% |
The equipment is installed, debugged and accepted through remote guidance through the Internet. Under the premise of stable COVID-19 and unlimited travel, the seller can arrange personnel to install and debug on the buyer’s site. During the seller’s installation and debugging, the buyer will provide the buyer with free meals and accommodation for the debugging personnel in accordance with the international four-star standard.
The equipment is shipped to the buyer’s location. After the seller receives the buyer’s notice, both parties will unpack the package within one week and conduct a complete set of inspection and acceptance according to the equipment packing list, including equipment accessories, spare parts, random documents and technical documents, etc. Only when the acceptance is qualified should the installation of the equipment begin.
Conduct acceptance test according to technical documents after commissioning.
We offer equipment training for the users. When the equipment is installed and commissioned at the user's site, the user's operation and maintenance personnel will be given some on-the-spot teaching in terms of the actual operation and maintenance training; Our technical personnel will help train 2 to 3 maintenance and operation workers in the following aspects: explaining the basic principles of equipment, maintenance knowledge, common fault causes and treatment methods
Send your inquiry directly to us