Place of Origin:
China
Brand Name:
Ruideer
Certification:
CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Model Number:
400*400*1800mm, 400*400*600mm
Design standards:
The vacuum debinding sintering integrated furnace is a single chamber and double door horizontal and periodic heating structure,which is designed for easy handling and maintenance, the whole process is controlled automatically.It can realize full load continuous operation, 300 furnace times/year or 300 working days/year.It uses graphite element resistance heating (low voltage, high current) .In addition, there are multiple heating units, each of which controls the temperature separately.It equipped with fully automatic control function and safety interlock function.The whole process is automatically controlled, monitored, tracked and recorded by computer.The PLC, industrial computer (PC) control to realize the whole process of one-key start, real-time dynamic monitoring, computer will save temperature, pressure, vacuum and other parameters ,alarm interlocking is safe and reliable.
General equipment requirements:
It is mainly used for vacuum sintering, vacuum cooling and rapid cooling of MIM stainless steel materials.It can meet the strict requirements for the uniformity of furnace temperature and atmosphere in the sintering process, and the furnace body structure design is advanced and reasonable, which is convenient for operation and maintenance.The main supporting components (control components, sensors, graphite heating element, thermocouple, main control valve, vacuum pump, etc.) have the international advanced level, can adapt to the long-term, stable, reliable mass production requirements.At the same time, the equipment meets the national requirements of energy conservation and environmental protection.
Technical parameters of equipment
Valid working zone size(W*H*L) |
400mm×400mm×1800mm |
Max.loading weight | 1000kg(The load is depends on the product type) |
Temperature | 1600℃(Design maximum temperature) |
1550℃(Actual working temperature) | |
Pumping speed |
The vacuum degree can reach 5Pa within 30min after starting the pump.The ultimate vacuum value reaches 1Pa after reaching 5Pa and pumping for 30min (after drying, cold, empty, dry). |
Leakage rate |
≤3Pa/h (stop the pump group operation and start the test after the limit vacuum is measured after the oven, .Empty furnace, clean, cold state, within 3 hours average value). |
Cooling speed |
≤7h(full loaded,from 1450℃ cooling down to 100℃,water temperature≤26℃,2bar≤water pressure≤3bar) |
Cooling mode |
It's equipped with rapid cooling fan that can cooling together with furnace. |
Max.heating rate |
8℃/min (in the case of vacuum and empty furnace, the room temperature rises to 1450℃, 600℃, 1000℃, 1200℃ half-way insulation is allowed). |
UPS guarantee time |
Power the indicator light and control the furnace during power off for more than 80 minutes. |
Send your inquiry directly to us