Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Horizontal Industrial Vacuum Sintering Furnace With Stable Supply Of Wear Parts

Horizontal Industrial Vacuum Sintering Furnace With Stable Supply Of Wear Parts

  • High Light

    Industrial Vacuum Sintering Furnace

    ,

    Horizontal Industrial Vacuum Sintering Furnace

    ,

    600mm Industrial Vacuum Furnace

  • Name
    Industrial Vacuum Furnace
  • Structure
    Horizontal
  • Design
    Customized
  • Warranty
    12 Months
  • Cooling Period
    60min-480min
  • Specifications
    Customer's Requirment
  • Place of Origin
    Zhuzhou City, Hunan Province, China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001; ISO14001; OHSAS 18001; GB/T29490
  • Model Number
    L: 600mm-1800mm
  • Minimum Order Quantity
    1 set
  • Price
    80000.00—350000.00(USD)
  • Packaging Details
    Special wooden case packing
  • Delivery Time
    5-6 months
  • Payment Terms
    L/C, T/T
  • Supply Ability
    8 sets/month

Horizontal Industrial Vacuum Sintering Furnace With Stable Supply Of Wear Parts

Quality Industrial Vacuum Furnace With Accurate Temperature Controlling

 

 

Characteristics
1. Design: JB4732-95, double-door horizontal structure, 20-year service life of furnace shell.
2. Special debinding process with excellent sealing structure helps avoid contaminating inner components.
3. Horizontal design for easy loading/unloading and maintenance.
4. Automatic control of the entire process.
5. This kind of high temperature sintering furnace adopts cyclic single-room heating mode. The whole process is automatically controlled, monitored, and recorded by the computer.
6. Heating elements are designed with cylindrical structure, compared with traditional square structure, which enjoys larger loading space, more flexible dimensions and more uniform atmosphere.

 

 

Temperature measurement mode : WRe5-26 thermocouple

 

Technical parameters:

 

Specifications

RDE-YTL-224 RDE-YTL-336/RDE-DYL-339 RDE-YTL-450 RDE-DYL-5518  

Effective space(w* h * l)mm

200*200*400mm

300*300*600/

300*300*900mm

450*450*1200/

450*450*1500mm

500*500*1800mm  

Max.Temperature

1600℃ 1600℃ 1600℃ 1600℃  
Maximum load 10Kg/50Kg 150Kg/200Kg 350Kg/400Kg 1500Kg  

Vacuum leakage rate:(Average in cold,empty,dry chamber in 3 hours)

1Pa/h 2Pa/h 2Pa/h 3Pa/h  
Extreme vacuum 0.8Pa 0.8Pa 0.8Pa 1Pa  
Wax-collection rate(negative pressure dewaxing process.The maximum average value is 3 furnaces) 98% 98% 98% 98%  

MAX working pressure

100KPa 100KPa 100KPa 100KPa  

Cooling period(Sintering temperature—100℃)

60min-150min 240min-300min 300min-420min 480min  

Temperature control mode

Single zone/2-zone

2-zone/3-zone

2-zone/3-zone

3-zone

 

Atmosphere and temperatureuniformity

Com≤±0.25%

Hc≤±0.35KA/M

Com≤±0.25%

Hc≤±0.35KA/M

Com≤±0.3%

Hc≤±0.4KA/M

Com≤±0.3%

Hc≤±0.4KA/M

 

Input gas allowed

Ar,N2,He,H2,

Functions: Vacuun dewaxing, H2 dewaxing, vacuum heating, heating with gas mixture(Co2 /CH4/H2), heating flowing gas, Rapid cooling.

 

 

Applications: For Cemented Carbide, Precision Ceramic, stainless steel, Iron-bae alloy, Copper-base alloy, Aluminum, high density alloy, tungsten-nickel alloy, tungsten-copper alloy, titanium alloy, carbon-atmosphere-sensitive metal products.