Send Message
Home > products > Vacuum Sintering Furnace >
Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering

Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering

Sinter HIP Vacuum Sintering Furnace

35T Rapid Cooling Vacuum Sintering Furnace

Partial Pressure Sintering HIP Furnace

Place of Origin:

China

Brand Name:

Ruideer

Model Number:

300*300*900mm, 400*400*1200mm

Contact Us
Request A Quote
Product Details
Certification:
CE, ISO90001
Usage:
Sintering Furnace
Warranty:
1 Year
Weight:
2T-35T
Valid Sintering Space:
Customizable
After-sales Service Provided:
Online One-on-one Support
Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
Negotiable
Packaging Details
Exempted from inspection wooden case
Delivery Time
100-120days
Payment Terms
T/T, L/C
Supply Ability
7 sets/month
Product Description

Vacuum Sintering Furnace With Sinter HIP Rapid Cooling Partial Pressure Sintering Function

 

Main application:

For mass production of high-performance cemented carbide materials which gathered dewaxing (It can realize vacuum dewaxing, H2 dewaxing, binder can be paraffin or PEG), Vacuum sintering, Low pressure Argon dynamic partial pressure sintering, High pressure Argon sintering, cooling, heat preservation and heating up under high temperature high pressure status

 

Service life

6000times / 20-years service life

Useful space

≥300×300×600mm

Max. Loading weight

100kg(It depends on sintering product and loading space)

Max. Designed temp.

1600℃(Heating temperature)

Max. Working temp.

1550℃

Ultimate vacuum degree

  1Pa(After heating in a cold,empty,dry condition)

Leakage rate

(average value in 24h)

 

  3pa/h(After testing ultimate vacuum,under empty cold,clean     condition,test in average 24h)

Wax Collection rate

 

≥98% (Argon or Nitrogen dewaxing with 10kg wax absolutely, average not more than 3 times )

Heating rate

8°C/min (in the case of vacuum and empty furnace, the room temperature rises to 1450°C, 600°C, 1000°C, and 1200°C can be kept for 40 minutes half way), full furnace≤5°C/min

Pressuring time

 

≤20min.Time can be set(When gas source is kept around 130bar,pressurized to required pressure)

Cooling time

 

≤4 hours( From 1450℃ drop to 100℃ when fully-loaded,water temperature≤30℃,50bar≤pressure≤58bar )

UPS time

 

Supply power to indicator and to control furnace when power-off, Keeping time≥60min

Temp.measurement Mode

 

Duplex core thermocouple,mutually redundant, stable and reliable

Temperature control mode

Single-zone temp. Control

Input gas allowed

Ar, N2, H2

Furnace Body weight

10 T

 

 

 

 

Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering 0Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering 1

 

 

 

 

 

 

 

Send your inquiry directly to us

Privacy Policy China Good Quality Sinter HIP Furnace Supplier. Copyright © 2019-2024 sinterhipfurnace.com . All Rights Reserved.