Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering

Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering

  • High Light

    Sinter HIP Vacuum Sintering Furnace

    ,

    35T Rapid Cooling Vacuum Sintering Furnace

    ,

    Partial Pressure Sintering HIP Furnace

  • Usage
    Sintering Furnace
  • Warranty
    1 Year
  • Weight
    2T-35T
  • Valid Sintering Space
    Customizable
  • After-sales Service Provided
    Online One-on-one Support
  • Certification
    CE, ISO90001
  • Place of Origin
    China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001
  • Model Number
    300*300*900mm, 400*400*1200mm
  • Minimum Order Quantity
    1 set
  • Price
    Negotiable
  • Packaging Details
    Exempted from inspection wooden case
  • Delivery Time
    100-120days
  • Payment Terms
    T/T, L/C
  • Supply Ability
    7 sets/month

Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering

Vacuum Sintering Furnace With Sinter HIP Rapid Cooling Partial Pressure Sintering Function

 

Main application:

For mass production of high-performance cemented carbide materials which gathered dewaxing (It can realize vacuum dewaxing, H2 dewaxing, binder can be paraffin or PEG), Vacuum sintering, Low pressure Argon dynamic partial pressure sintering, High pressure Argon sintering, cooling, heat preservation and heating up under high temperature high pressure status

 

Service life

6000times / 20-years service life

Useful space

≥300×300×600mm

Max. Loading weight

100kg(It depends on sintering product and loading space)

Max. Designed temp.

1600℃(Heating temperature)

Max. Working temp.

1550℃

Ultimate vacuum degree

  1Pa(After heating in a cold,empty,dry condition)

Leakage rate

(average value in 24h)

 

  3pa/h(After testing ultimate vacuum,under empty cold,clean     condition,test in average 24h)

Wax Collection rate

 

≥98% (Argon or Nitrogen dewaxing with 10kg wax absolutely, average not more than 3 times )

Heating rate

8°C/min (in the case of vacuum and empty furnace, the room temperature rises to 1450°C, 600°C, 1000°C, and 1200°C can be kept for 40 minutes half way), full furnace≤5°C/min

Pressuring time

 

≤20min.Time can be set(When gas source is kept around 130bar,pressurized to required pressure)

Cooling time

 

≤4 hours( From 1450℃ drop to 100℃ when fully-loaded,water temperature≤30℃,50bar≤pressure≤58bar )

UPS time

 

Supply power to indicator and to control furnace when power-off, Keeping time≥60min

Temp.measurement Mode

 

Duplex core thermocouple,mutually redundant, stable and reliable

Temperature control mode

Single-zone temp. Control

Input gas allowed

Ar, N2, H2

Furnace Body weight

10 T

 

 

 

 

Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering 0Vacuum Sintering Furnace Rapid Cooling Partial Pressure Sintering 1