Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Hard Alloys Precision Ceramics Vacuum Sintering Furnace Rapid Cooling 180 KVA

Hard Alloys Precision Ceramics Vacuum Sintering Furnace Rapid Cooling 180 KVA

  • High Light

    Precision Ceramics Vacuum Induction Furnace

    ,

    Alloys Vacuum Induction Furnace

    ,

    180 KVA Metal Sintering Furnace

  • Place of Origin
    Zhuzhou, Hunan Province, China
  • Brand Name
    Ruideer
  • Certification
    CE; ISO9001; ISO14001; OHSAS 18001; GB/T29490
  • Model Number
    Customizable
  • Minimum Order Quantity
    1 set
  • Price
    USD 93,000-77,000,000
  • Packaging Details
    Special wooden box
  • Delivery Time
    5-8 months
  • Payment Terms
    L/C, T/T
  • Supply Ability
    7 sets / month

Hard Alloys Precision Ceramics Vacuum Sintering Furnace Rapid Cooling 180 KVA

Hard Alloys /Precision Ceramics /Vacuum Sintering Furnace/Rapid Cooling/180 KVA

Equipment function:
Automatic leak detection function
Vacuum sintering function
Ar gas partial sintering function(Static , dynamic partial pressure)
Electrified cooling and insulation function
Rapid cooling function(Put a heat exchanger inside)
Fully automatic control function
Safety interlock function
Break point reheating function
Break point reheating function

 

Design standards:
The vacuum sintering furnace is a single chamber and double door horizontal and periodic heating structure,which is designed for easy handling and maintenance.The whole process is controlled automatically. It can realize full load continuous operation, 300 furnace times/year or 300 working days/year. It uses graphite element resistance heating (low voltage, high current) . In addition, there are multiple heating units, each of which controls the temperature separately.

 

Device color matching:
The surface of furnace body, transformer, control cabinet and vacuum pump is light gray (color code: RAL7035). The furnace foot, pump frame and support are matched by sky blue (color code: RAL5015).

 

 

Technical Parameters

 

Available working zone size(W*H*L)

400mm×400mm×1200mm
 Max.loading weight 550kg
Maximum working temperature 1600℃
Actual working temperature 1550℃
Pumping speed

The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

(After drying the furnace, under the empty furnace, clean and cold state.)

Leakage rate

≤3Pa/h

(Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test. Average within 3 hours in empty furnace, clean and cold state)

 

Cooling speed

 

Empty furnace,the cooling time of cooling temperature from 1300℃ down to 100℃ just cost less or equal 5 hours.(water temperature≤28℃, 2bar≤water pressure≤3bar)
 Heating rod material Graphite
Heating up speed Empty furnace heating up≤5℃

 

Heating power

 

It is about 120KVA (the power configuration of the heating transformer is related to the heating speed, and the heating power can be automatically limited according to the actual use of the production).

 

Uninterrupted power supply guarantee time

 

It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes.