300*300*1200-10MPa sinter-HIP furnace can be controlled automatically with full load continuous operation
Equipment function:
Automatic positive pressure and negative pressure leak detection function
Vacuum sintering function
Sinter-HIP function
Rapid cooling function(Put a heat exchanger inside)
Fully automatic control function
Safety interlock function
Break point reheating function
Wireless remote diagnosis function
General equipment requirements:
The equipment is mainly used for vacuum sintering,pressure sinyering,rapid cooling and so on.It can meets the strict requirement of uniformity of furnace temperature and atmosphere in sintering process of silicon nitride.The furnace structure design is advanced and reasonable, easy to use operation and maintenance.The main supporting components (control components, sensors, graphite heating element, thermocouple, main control valve, vacuum pump, etc.) have the international advanced level, can adapt to the long-term, stable, reliable batch production requirements.At the same time, the equipment meets the national requirements for energy conservation and environmental protection.
Technical Parameters
Service life of furnace shell |
20 years |
Furnace shell design working time |
6000(furnace/time) |
Effective working zone size(W*H*L) |
≥350mm×30mm×1200mm |
Max.loading capacity |
300kg(it depends on the type of loading product) |
Max.design temperature |
2000℃ (Under the circumstance of vacuum sintering.drying furnace to 2000℃) |
Max.working temperature |
1850℃(Under vacuum and sinter-HIP status |
Max.design pressure |
100bar |
Max.working pressure |
98bar |
Pumping speed |
The vacuum degree can reach 5Pa within 30min after the pump is started, and the ultimate vacuum value can reach 2Pa. (After drying the furnace,under the empty furnace, clean and cold status) |
Leakage rate |
≤3pa/h (Average value within 3 hours in empty furnace, clean and cold status) |
Fully loading cooling time |
When inner furnace loaded fully material,the sintering temperature from 1850℃ cooling to 100℃(temperature of open furnace).Cooling time≤6h(water temperature≤26℃,95bar≤pressure≤98bar) |
Fill high pressure Argon |
It adopt intermittent stable gas charging, charging time can be set.The system accurately matches the relationship between charging amount and time to ensure the following of gas charging. |
Pressure time |
The pressurization time to 98Bar is less than and equal 15 minutes,which can be set.(The gas resource is stable in the range of 120bar-150bar) |
Pressure media |
Ar or N2(purity≥9.99%) |
Uninterrupted power supply guarantee time
|
It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes. |
Heating up speed |
≤10℃/min (In the case of empty furnace, the intermediate temperature section is allowed to keep temperature.) |
Heating power |
About 420KVA |
Heating mode |
Graphite resistance heating |
Temperature control mode |
3 zone temperature control independently |
After sales:
1. Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2. Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.