200*200*400 vacuum sintering integrated furnace with Multiple heating units, each unit is independently controlled Temp.
Equipment system:
It mainly includes control system, heating system, vacuum system, cooling water system, rapid cooling system, safety system and auxiliary system.
Design standard:
The vacuum sintering integrated furnace is a single chamber double door horizontal and periodic heating structure.The design is easy to load and unload and maintain, and the whole process is controlled automatically.Realize full load continuous operation, 300 furnace times/year or 300 working days/year.Graphite element resistance heating (low voltage, large current);With a plurality of heating units, each unit is independently controlled temperature;Automatic control function, safety interlock function, the whole process by computer automatic control, monitoring, tracking, fault self-diagnosis simulation display and record.PLC, industrial computer (PC) control to realize the whole process of a key start, real-time dynamic monitoring, computer temperature, pressure, vacuum degree and other parameters to save, safe and reliable alarm interlock.
General requirements of equipment:
Mainly used for hard alloy, ceramic materials, wear-resistant materials, high temperature alloy AR, vacuum sintering, partial pressure sintering (static, dynamic), vacuum cooling, rapid cooling and other processes.It meets the strict requirements of furnace temperature uniformity and atmosphere uniformity in the sintering process of the product. The furnace structure design is advanced and reasonable, which is convenient for operation and maintenance.The main supporting components (control components, sensors, graphite heating element, thermocouple, main control valve, vacuum pump, etc.) have the current international advanced level, can adapt to the long-term, stable, reliable mass production requirements.At the same time, the equipment to meet the national energy saving, environmental protection requirements.
Equipment technical parameters
Effective working zone(W*H*L) | 200mm×200mm×400mm |
Max.loading weight |
50kg(The amount of load depends on the type of product) |
Temperature |
1600℃(Max.design temperature) |
1550℃(Actual working temperature) | |
Pumping speed |
The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa (After drying the furnace,under the empty furnace, clean and cold state.) |
Leakage rate |
≤3Pa/h (Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test.Average within 3 hours in empty furnace, clean and cold state) |
Cooling speed |
Empty furnace,the cooling time of cooling temperature from 1300℃ down to 100℃ just cost less or equal 5 hours.(water temperature≤28℃,2bar≤water pressure≤3bar) |
Cooling mode |
The inner furnace is equipped with rapid cooling fan and cooling water realize rapid cooling. |
Heating element material | Graphite |
Heating zone quantity | 3 zone temperature control independently |
Temperature control mode | PID adjust mode |
Heating up speed | Full furnace heating up≤5℃ |
Heating power | About 150kVA (the power configuration of the heating transformer is related to the heating rate). |
Uninterrupted power supply guarantee time |
It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes. |
Uniformity of atmosphere in sintering zone |
Positive pressure or negative pressure debinding integration sintering uniformity: furnace control sheet (YC40 or YG6 particles), paraffin molding agent, evenly distributed on the flat boat.The buyer shall provide the furnace control plate and program, and the seller shall confirm.Cobalt magnetic field: test cobalt magnetic field after dewaxing, deviation range: ≤±0.3%;Coercive force: deviation range: ≤± 0.4kA /M.The uniformity of furnace temperature is the standard of the uniformity of coercive force. |
After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,and the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.