Place of Origin:
China
Brand Name:
Ruideer
Certification:
CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Model Number:
300*300*500
300*300*500 Integrated vacuum dewaxing sintering furnace with single chamber and double door
Equipment system:
It mainly includes control system,heating system,positive and negative pressure dewaxing system, vacuum system,cooling water system, rapid cooling system,safety system and auxiliary system.
Design standards:
The cemented carbide pressure sintering furnace is a single chamber and double door horizontal and periodic heating structure,which is designed for easy handling and maintenance, the whole process is controlled automatically.It can realize full load continuous operation, 300 furnace times/year or 300 working days/year.It uses graphite element resistance heating (low voltage, high current) .In addition, there are multiple heating units, each of which controls the temperature separately.It equipped with fully automatic control function and safety interlock function.The whole process is automatically controlled, monitored, tracked and recorded by computer.The PLC, industrial computer (PC) control to realize the whole process of one-key start, real-time dynamic monitoring, computer will save temperature, pressure, vacuum and other parameters ,alarm interlocking is safe and reliable.
Painting:
The surface of furnace body, transformer, control cabinet and vacuum pump is light gray (color code: RAL7035). The furnace foot, pump frame and support are matched by sky blue (color code: RAL5015).The groove is stainless steel, the support is galvanized, the transformer is placed on the ground.
Technical parameters of equipment
Service life of furnace shell |
20 years |
Furnace shell working time |
6000 (furnace/time) |
(W*H*L) Effective working zone size |
300mm×300mm×1000mm |
Max.loading capacity |
100kg(it depends on the type of product) |
Working temperature |
2000℃(The maximum design temperature) |
1450℃(The actual working temperature) | |
Pumping speed |
The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa (After drying the furnace,under the empty furnace, clean and cold state) |
Leakage rate |
≤3Pa/h (Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test.Average within 3 hours in empty furnace, clean and cold state) |
Cooling speed |
The furnace is empty.From 1450℃ cooling to 100℃ will cost less than and equal to 6 hours.(Water temperature≤28℃,2bar≤Water pressure≤3bar)
|
Cooling mode |
The inner furnace is equipped with rapid cooling fan and water cooling will cooling with the furnace.
|
Heating element material |
molybdenum |
Heating zone quantity |
3 zone control temperature independently |
Temperature control mode |
PID adjustment |
Heating power |
About 220KVA |
After sales:
1.Installation, Commissioning And Acceptance
We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.
The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.
2.Training
When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)
3. Warranty period
The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.
Send your inquiry directly to us