Place of Origin:
China
Brand Name:
Ruideer
Certification:
CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Model Number:
User-defined
High efficient operation metal sintering dewaxing furnace(can be used to lab and industrial)
Main application
The metal sintering furnace is designed for sintering of hardmetal products. The sinter-HIP furnace comprises single-chamber water-cooled horizontal furnace body with two water-cooled doors, a control system , heating system, vacuum system, debinding system, Н2 burn-off system, water cooling system, gas system, heat insulation, fast cooling system, safety system, and hydraulic system.
Humidity and temperature requirement
Humidity: <90%(at 35 oC)
Temperature: 0 ~ + 45 ℃
Power supply parameters
Power supply: 375 ~ 430 V, 50 Hz, 3-phase 5-wire system
Control power supply: 210 ~ 250 V, 50 Hz, single-phase
Demand (power): ≥410 kV·А, customer is to arrange power cable with cross-section: ≥180 mm2
Basic technical parameters
Item No. |
Parameter
|
Required value
|
1 |
Service life
|
6000 cycles / 20-year service life
|
2 |
Useful space (load size with parts)
|
≥510×470×1000 mm (W×H×L) |
3 |
Max. charge weight (including graphite furniture for part support)
|
1000 kg |
4 |
Max. design temperature
|
1600 ℃ |
5 |
Max. working temperature
|
1550℃ |
6 |
Max. working pressure
|
55 bar |
7 |
Ultimate vacuum
|
1 Pa(After heating,in cold,empty, dry condition)
|
8 |
Vacuuming rate
|
The vacuum degree down to 3 Pa to be reached within 40min after the start of the pump,the vacuum degree can get to 1pa after vacuuming continually within 30min (After heating,in cold,empty, dry condition)
|
9 |
Vacuum leak rate (average over 24 h)
|
3 Pa per hour (After heating, in cold,empty, dry condition)
|
10 |
Binder collection %
|
≥ 98% (dewaxing in Ar, total 10kg wax, avg. max. 3 times)
|
11 |
Max. heating rate
|
8℃/minute in empty furnace 5 ℃/minute in fully loaded furnace
|
12 |
Pressurization time up to 55 bar
|
≤ 20 minutes :At Heating,empty or fully loaded at furnace temperature of1450-1550deg.C,Ar pressure minimum 120 bar(Reducing valve should prepared by customer itself)
|
13 |
Cooling time
|
≤ 7 h (1480℃ down to 100℃ with fully loaded furnace, at cooling water temperature ≤28℃)
|
14 |
UPS-powered operation time for control electronics
|
UPS powers the indicators and controls of the furnace in case of blackout; UPS-powered operation time ≥ 60 min
|
15 |
Temperature uniformity |
≤ ±7℃. Measured by sintering of the FERRO ceramic shrink rings in the empty furnace under vacuum at 1450℃ on graphite trays. Can be soak in process (FERRO shrink rings should be supplied by the buyer.Suggest grade of 334,because the test ring are multifarious,The test only as reference,take below item3.16 as main test standard)
|
16 |
Parameter uniformity in sintered products
|
To be measured by sintering of the witness YG8 or YC40 grade hardmetal samples (with paraffin or PEG binder): max. magnetic saturation scatter ≤ ± 0,20%, max. coercivity scatter ≤ ± 0.3kA/m. Hardmetal witness plates to be delivered by the Buyer, the quality of the samples to be confirmed by the Seller.
|
17 |
Furnace temperature measurement mode
|
Single thermocouples WRe5-26 in double-TC tubes
|
18 |
Temperature control mode
|
3 zone temperature control
|
19 |
H2 during debinding
|
Flow range: 1 to 150 standard Liters per minute (slm). Flow control resolution (increment): 1slm.
|
20 |
Dimensions and footprint of the furnace
|
As per Appendix 2
|
21 |
Functions
|
Vacuum dewaxing, H2 dewaxing, vacuum sintering, partial pressure sintering, gas pressure sintering, vacuum cooling, controlled Ar pressure cooling, fast cooling
|
Send your inquiry directly to us