Send Message
Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Compact Structure MIM Sintering Furnace Temperature Control Mode 2 Zone

Compact Structure MIM Sintering Furnace Temperature Control Mode 2 Zone

  • High Light

    debinding sintering furnace

    ,

    mim furnace

  • Name
    MIM Sintering Furnace
  • Temperature Measurement Mode
    WRe5-26 Thermocouple
  • Vacuum Pump
    Backing Pump, Roots-type Pump
  • Applications
    Stainless Steel, Iron Based, Copper Based Alloy.ect
  • Temperature Control Mode
    2-zone
  • Advantage
    Compact Structure ,small Occupation Area, Low Energy Consumption.ect
  • Place of Origin
    Zhuzhou City, Hunan Province,China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
  • Minimum Order Quantity
    1 set
  • Price
    80000.00-350000.00(USD)
  • Packaging Details
    Special wooden case packing
  • Delivery Time
    100-120 work days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    8 sets/month

Compact Structure MIM Sintering Furnace Temperature Control Mode 2 Zone

Compact Structure MIM Sintering Furnace Temperature Control Mode 2 Zone
 
 
Description:
Metal injection molding (MIM) is a metalworking process by which finely-powdered metal is mixed with a measured amount of binder material to comprise a "feedstock" capable of being handled by plastic processing equipment through a process known as injection mold forming.
 
Vacuum pump: backing pump, Roots-type pump(slide valve pump, rotary vane pump, screw pump and so on can be selected for the backing pump, allowing customers to choose world-class brand products)
 
Power supply: General standard is three phase five wire system AC380V±10% 50HZ.
Control power supply: Single-phase AC210V-250V 50HZ design(Different countries and regions can be designed according to local grid standards)
 
Temperature measurement mode: WRe5-26 thermocouple
 
Applications: It can sinering stainless steel, iron - based, copper - based alloy, aluminum products and other precision parts. For example, the card slot and card support of mobile phone and mobile phone shell frame,Glasses foot hinge,Medical instruments (scalpel, forceps), precision handicraft.
 
Technical parameters:
 
 

SpecificationsRDE-YTL-4412/RDE-YTL-4415RDE-DYL-5518
Effective space(w* h * l)mm

400*400*1200/
400*400*1500

500*500*1800
Max.Temperature1600℃1600℃
Maximum load300Kg/350Kg1500Kg
Vacuum leakage rate:(Average in cold,empty,dry chamber in 3 hours)2Pa/h3Pa/h
Extreme vacuum0.8Pa1Pa
Wax-collection rate(negative pressure dewaxing process.The maximum average value is 3 furnaces)98%98%
MAX working pressure100KPa100KPa
Cooling period(Sintering temperature—100℃)300min-420min480min
Temperature control mode2-zone2-zone
Input gas allowedAr,N2,He,H2,CH4,Co2
Functions:Vacuun dewaxing,H2 dewaxing,vacuum heating,heating with gas mixture(Co2 /CH4/H2),heating flowing gas,Rapid cooling.

 
 
Competitive Advantage:
1. Compact structure ,small occupation area, low energy consumption, rapid cooling speed, saving energy and protecting environment.
2. Program has resume-heat-at-breakpoint function, no need to restart the program in case of short time power failure.
3. Slot type loading space,Precision parts are heated evenly during sintering without deformation.
4. Convenient and intelligent: The control interface of sintering furnace can be monitored by mobile phone, control and understand the running state of the equipment anytime and anywhere. Fully automatic one-key operation function, realize the supervision of multiple devices by one person, intelligent production, and docking ERP management system.
5. Complete after-sales service system: Provides 7 x 24 hour telephone hotline.Propose solutions within 2 hours after receiving the customer's fault notice. With 15 experienced professional after-sales service staff, not only responsible for the company's product installation and debugging, but also for the need of users to complete the domestic and foreign manufacturers of sintering furnace after-sales and maintenance work.
6. Convenient service: If the customer has the demand may carry on the sintering product test in the Ruideer company site, and the company production site has the hot state pressure condition.
7. Quick installation: The installation can be completed and put into production within 15 days when water, electricity and gas are in place.