Place of Origin:
Zhuzhou City, Hunan Province,China
Brand Name:
Ruideer
Certification:
CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Model Number:
User-defined
Horizontal Industrial Vacuum Furnace With Cylindrical Structure Heating Elements
Characteristics
1. Design: JB4732-95, double-door horizontal structure, 20-year service life, 6000 times of use.
2. Special debinding process with excellent sealing structure helps avoid contaminating inside components.
3. Horizontal design for easy loading/unloading and maintenance.
4. Automatic control of the entire process.
5. This kind of high temperature sintering furnace adopts cyclic single-room heating mode. The whole process is automatically controlled, monitored, and recorded by the computer.
6. Heating elements are designed with cylindrical structure, which, compared with traditional square structure, enjoys larger loading space, more flexible dimensions and more uniform atmosphere.
Vacuum pump: backing pump, Roots-type pump(slide valve pump, rotary vane pump, screw pump and so on can be selected for the backing pump, allowing customers to choose world-class brand products)
Temperature and atmosphere uniformity: The magnetic force of the furnace control block is different from that of the cobalt magnetic deviation. Conventional sintering furnace test furnace control block brand is YG6 medium particles, YC40.Debinding pressure sintering integrated.
Power supply: General standard is three phase five wire system AC380V±10% 50HZ.
Control power supply: Single-phase AC210V-250V 50HZ design(Different countries and regions can be designed according to local grid standards)
Temperature measurement mode : WRe5-26 thermocouple
Technical parameters:
Specifications |
RDE-YTL-112/RDE-YTL-224 | RDE-YTL-336/RDE-DYL-339 | RDE-YTL-4545120/RDE-DYL-4545150 | RDE-DYL-5518 | RDE-YTL-5550191 |
Effective space(w* h * l)mm |
100*100*200/ 200*200*400 |
300*300*600/ 300*300*900 |
450*450*1200/ 450*450*1500 |
500*500*1800 | 550*500*1910 |
Max.Temperature |
1600℃ | 1600℃ | 1600℃ | 1600℃ | 1600℃ |
Maximum load | 10Kg/50Kg | 150Kg/200Kg | 350Kg/400Kg | 1500Kg | 1800Kg |
Vacuum leakage rate:(Average in cold,empty,dry chamber in 3 hours) |
1Pa/h | 2Pa/h | 2Pa/h | 3Pa/h | 3Pa/h |
Extreme vacuum | 0.8Pa | 0.8Pa | 0.8Pa | 1Pa | 1.5Pa |
Wax-collection rate(negative pressure dewaxing process.The maximum average value is 3 furnaces) | 98% | 98% | 98% | 98% | 98% |
MAX working pressure |
100KPa | 100KPa | 100KPa | 100KPa | 100KPa |
Cooling period(Sintering temperature—100℃) |
60min-150min | 240min-300min | 300min-420min | 480min | 480min |
Temperature control mode |
Single zone/2-zone |
2-zone/3-zone |
2-zone/3-zone |
3-zone |
3-zone |
Atmosphere and temperatureuniformity |
Com≤±0.25% Hc≤±0.35KA/M |
Com≤±0.25% Hc≤±0.35KA/M |
Com≤±0.3% Hc≤±0.4KA/M |
Com≤±0.3% Hc≤±0.4KA/M |
Com≤±0.3% Hc≤±0.4KA/M |
Input gas allowed |
Ar,N2,He,H2,CH4,Co2 | ||||
Functions: Vacuun dewaxing, H2 dewaxing, vacuum heating, heating with gas mixture(Co2 /CH4/H2), heating flowing gas, Rapid cooling. |
Applications: For Cemented Carbide, Precision Ceramic, stainless steel, Iron-bae alloy, Copper-base alloy, Aluminum, high density alloy, tungsten-nickel alloy, tungsten-copper alloy, titanium alloy, carbon-atmosphere-sensitive metal products.
Ruideer Service
Pre-sale Service:
1. Reply your inquiry in 24 working hours.
2. Experienced staffs answer all your questions in fluent English.
3. Customized design is available.
On-purchase Service:
1. Exclusive and unique solution can be provided to our customer by our well trained and professional engineers and staff.
2. As an honest seller, we always use superior electronic parts and components, advanced machines,skilled technicians to ensure our products to be finished in high quality and stable feature.
After-sales Service:
1. The equipment warranty period is 12 months. Equipment failure happens, after-sales service personnel shall give solutions within 48 hours, after receiving the buyer's notification .
2. If need to get to the scene , the after-sales service personnel should be arrived at the scene within 72 hours after passing visa. And must be continuous to repair, until fault be excluded, Furnace running back to normal.
3. When taking-over the Furnace to the customer, We will give a staff training to customer.
Send your inquiry directly to us