Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Max Temperature 1600℃ Vacuum Pressure Furnace , Sinter HIP Furnace Wax Collection Rate 98%

Max Temperature 1600℃ Vacuum Pressure Furnace , Sinter HIP Furnace Wax Collection Rate 98%

  • High Light

    vacuum pressure furnace

    ,

    high pressure furnace

  • Name
    Vacuum Pressure Furnace
  • Wax-collection Rate
    98%
  • Temperature Variation
    ≤ ±5°C
  • Magnetic Saturation Deviation
    ≤±0.2%
  • Coercivity Deviation
    ≤±0.3KA/M
  • Cemented Carbide After Sintering
    Bending Strength: 3000
  • Place of Origin
    Zhuzhou City, Hunan Province,China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
  • Minimum Order Quantity
    1 set
  • Price
    250000.00——1000000.00(USD)
  • Packaging Details
    Special wooden case packing
  • Delivery Time
    100-120 work days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    8 sets/month

Max Temperature 1600℃ Vacuum Pressure Furnace , Sinter HIP Furnace Wax Collection Rate 98%

Max Temperature 1600℃ Vacuum Pressure Furnace , Sinter HIP Furnace Wax Collection Rate 98%

 

 

Description
Our vacuum-pressure sintering furnaces are ideally suited for dewaxing, sintering and pressure sintering processes of stainless steel, iron-based alloy, copper-based alloy, aluminum products, tungsten alloy, magnetic and cemented carbide, etc.

Main Properties
1. Wax-collection rate: 98%.
2. Temperature & atmosphere uniformity:
Coercivity deviation: ≤±0.3KA/M;
Magnetic saturation deviation: ≤±0.2%.
3. Temperature variation: ≤ ±5°C.

Properties of cemented carbide after sintering:
1. Bending strength: 3000;
2. Porosity: A00-A02;
3. Density: 14.95.

 

 

Technical parameters:

 

 

Specifications

RDE-DYL-224 RDE-DYL-336/RDE-DYL-339 RDE-DYL-3535120/RDE-DYL-4412 RDE-DYL-5512/RDE-DYL-5518 RDE-DYL-5527

Effective space(w* h * l)mm

200*200*400

300*300*600/

300*300*900

350*350*1200/

400*400*1200

500*500*1200/

500*500*1800

500*500*2700

Max.Temperature

1600℃ 1600℃ 1600℃ 1600℃ 1600℃
Maximum load 50Kg 150Kg/200Kg 300Kg/350Kg 1200Kg/1500Kg 2000Kg

Vacuum leakage rate:(Average in cold,empty,dry chamber in 3 hours)

1Pa/h 2Pa/h 2Pa/h 3Pa/h 3Pa/h
Extreme vacuum 0.8Pa 0.8Pa 0.8Pa 1Pa 1.5Pa
Wax-collection rate(negative pressure dewaxing process.The maximum average value is 3 furnaces) 98% 98% 98% 98% 98%

Working pressure

1MPa/2MPa/

6MPa/10MPa

1MPa/2MPa/

6MPa/10MPa

1MPa/2MPa/

6MPa/10MPa

1MPa/2MPa/

6MPa/10MPa

1MPa/2MPa/

6MPa/10MPa

Cooling period(Sintering temperature—100℃)

40min-120min 40min-150min 120min-360min 180min-420min 180min-480min

Temperature control mode

Single zone/2-zone

2-zone/3-zone

2-zone/3-zone

3-zone/4-zone

4-zone

Atmosphere and temperatureuniformity

Com≤±0.15%

Hc≤±0.25KA/M

Com≤±0.15%

Hc≤±0.25KA/M

Com≤±0.2%

Hc≤±0.3KA/M

Com≤±0.2%

Hc≤±0.3KA/M

Com≤±0.2%

Hc≤±0.3KA/M

Input gas allowed

Ar,N2,He,H2,CH4,Co2

Functions:Vacuun dewaxing,H2 dewaxing,vacuum heating,heating with gas mixture(Co2 /CH4/H2),heating flowing gas,heating pressure gas,Rapid cooling.

 

Applications:For Cemented Carbide , Precision Ceramic , stainless steel , Iron-bae alloy , Copper-base alloy , Aluminum products

 

Competitive Advantage:

 

1. Compact structure, small occupation area, low energy consumption, rapid cooling speed, saving energy and protecting environment.

2. Full range of sizes available, canbe usedin experimental research and development, Small and medium-sized enterprises as well as mass prodution. We can design the procucts according to customer’s special requirement.

3. High automation level : one-button start, Double industrial PC operating system, mutually redundant,safe and reliable.

4. The Insulation box is of good insulation effect, free of volatilization athigh temperature, with long life.It adopts “sandwich structure”and CFC material inside and outside with high strength, will be no deformation afteer many years use.

5. Program has resume-heat-at-breakpoint function, no need to restart the program in case of short time power failure.

6. Convenient and intelligent: The control interface of sintering furnace can be monitored by mobile phone, control and understand the running state of the equipment anytime and anywhere. Fully automatic one-key operation function, realize the supervision of multiple devices by one person, intelligent production, and docking ERP management system.

7. Complete after-sales service system: Provides 7 x 24 hour telephone hotline. Propose solutions within 2 hours after receiving the customer's fault notice. With 15 experienced professional after-sales service staff, not only responsible for the company's product installation and debugging, but also for the need of users to complete the domestic and foreign manufacturers of sintering furnace after-sales and maintenance work.

8. Quick installation : The installation can be completed and put into production within 15 days when water, electricity and gas are in place.