Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment

Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment

  • High Light

    horizontal vacuum furnace

    ,

    sic furnace

  • Name
    High Vacuum Furnace
  • Max.Temperature
    1800℃
  • Extreme Vacuum
    3×10-3Pa
  • Temperature Control Mode
    3-zone
  • Maximum Load
    1500Kg
  • Applications
    Non-metal Ceramic, Precision Ceramic,ect
  • Place of Origin
    Zhuzhou City, Hunan Province,China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
  • Minimum Order Quantity
    1 set
  • Price
    200000.00(USD)
  • Packaging Details
    Special wooden case packing
  • Delivery Time
    100-120 work days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    8 sets/month

Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment

Max Temperature 1800℃ High Vacuum Furnace Low Energy Consumption Protecting Environment

 

 

 

Description:

The high vacuum furnace is single-chamber, horizontal and periodic heating. It adopt low voltage and large current graphite heating element to heating, and it has multiple heating units, each unit controls the temperature separately. The whole process is automatically controlled, monitored, tracked and displayed and recorded by the computer.

It including control system, heating system, vacuum system, cooling water system, rapid cooling system, auxiliary system and safety system.

It adopt the structure of built-in graphite liner in insulation tube. In general, it meets the strict requirements of temperature uniformity and atmosphere uniformity in the sintering process of high-performance materials. The furnace structure design is advanced and reasonable, and it is easy to use and maintain.

 

Vacuum pump: backing pump, Roots-type pump(slide valve pump, rotary vane pump, screw pump and so on can be selected for the backing pump, allowing customers to choose world-class brand products)

 

Power supply: General standard is three phase five wire system AC380V±10% 50HZ.

Control power supply:Single-phase AC210V-250V 50HZ design(Different countries and regions can be designed according to local grid standards)

 

Temperature measurement mode: WRe5-26 thermocouple

 

Technical parameters: 

 

Specifications

RDE-GWL-5518

Effective space(w* h * l)mm

500*500*1800

Max.Temperature

1800℃
Maximum load 1500Kg

Vacuum leakage rate:(Average in cold,empty,dry chamber in 3 hours)

3Pa/h
Extreme vacuum 3×10-3Pa

MAX working pressure

100KPa

Cooling period(Sintering temperature—100℃)

480min

Temperature control mode

3-zone

Functions:

vacuum heating,heating flowing gas,Rapid cooling.

 

ApplicationsFor Non-metal ceramic, Precision Ceramic, Life ceramics, Industrial ceramics, Sic carbide

 

Competitive Advantage:

 

1. Compact structure, small occupation area, low energy consumption, rapid cooling speed, saving energy and protecting environment.  

2. Full range of sizes available,can be used in experimental research and development, Small and medium-sized enterprises as well as mass production. We can design the products according to customer’s special requirement.

3. High automation level: one-button start, Double industrial PC operating system, mutually redundant, safe and reliable.

4. The control system is full-automatic with data record &backup function, the operation system is more humanized, more powerful.

5. The Insulation box is of good insulation effect, free of volatilization athigh temperature, with long life. It adopts “sandwich structure”and CFC material inside and outside with high strength, will be no deformation afteer many years use.

6. Program has resume-heat-at-breakpoint function, no need to restart the program in case of short time power failure.

7. Convenient service: If the customer has the demand may carry on the sintering product test in the Ruideer company site, and the company production site has the hot state pressure condition.

8. Quick installation: The installation can be completed and put into production within 15 days when water, electricity and gas are in place.