Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd 86--16673365810 shirley.xiao@zzrde.com
Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace

Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace

  • High Light

    vacuum furnace equipment

    ,

    dewaxing furnace

  • Name
    Metal Sintering Furnace
  • Loading Space
    450*450*1200/500*500*1800
  • Cooling Period
    ≤5h/ ≤6h
  • Functions
    H2 Dewaxing,heating Flowing Gas,ect
  • Advantages
    Compact Structure, Small Occupied Area.ect
  • Temp.Control Mode
    3-zone Or 4-zone Temp. Control
  • Place of Origin
    Zhuzhou City, Hunan Province,China
  • Brand Name
    Ruideer
  • Certification
    CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
  • Model Number
    450×450×1200/500×500×1800
  • Minimum Order Quantity
    1 set
  • Price
    80000.00-350000.00(USD)
  • Packaging Details
    Special wooden case packing
  • Delivery Time
    100-120 work days
  • Payment Terms
    L/C, T/T
  • Supply Ability
    8 sets/month

Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace

Rapid Cooling Time 5-6h Sintering Furnace Process , Easy Loading Metal Sintering Furnace

 

 

Features

1. Rapid cooling time: only needs 5 - 6 hours.

2. Special debinding process with excellent sealing structure helps avoid contaminating inside components.

3. Horizontal design for easy loading/unloading and maintenance.

4. Automatic control of the entire process.

5. This kind of integrated vacuum dewaxing and sintering furnace adopts cyclic single-room heating mode. The whole process is automatically controlled, monitored, and recorded by the computer.

6. Heating elements are designed with cylindrical structure, which, compared with traditional square structure, enjoys larger loading space, more flexible dimensions and more uniform atmosphere.

 

 

Loading space 450*450*1200/500*500*1800
Max.working Temp: 1600℃
Cooling Period ≤5h/ ≤6h
Vacuum leakage rate 3Pa/h(Average in cold,empty,dry chamber within 24 hours)
Vacuum pump Slide-valve Pump,Roots Pump (Imported Pump or domestic Pump according to customer's requirement)
Wax-collection Rate ≥98%
Temp.& Atmosphere Uniformity ± 0.4KAM,Magnetic saturation: ≤ ±0.3,Temp.variation:≤ ±8℃
Temp. measurement Mode Wre5-26 thermocouple
Temp.Control Mode 3-zone or 4-zone Temp. Control
Functions Vacuum heating,vacuum dewaxing,H2 dewaxing,heating flowing gas,heating with gas mixture(CO2,CH4,H2),Rapid cooling
Heating power 180KVA/280KVA

 

Note: The above specifications are defined according to cemented carbide .The above parameters can be adjusted to the process requirements, they are not as acceptance standard, the detailed spec. will be stated in the technical proposal and agreements.

 

Advantages

1. Compact structure, small occupied area, low energy consumption and rapid cooling speed, saving energy and protecting environment.

2. Full range of sizes available, ranging from furnaces for experimental R&D, small and medium-sized enterprises to furnaces for mass production. We can also design integrated vacuum dewaxing and sintering furnaces of other sizes according to customer’s specific requirements.

3. Round or square graphite box is available for different applications.

4. Complete dewaxing mode with high wax-collection rate, suitable for different forming agents including rubber, paraffin wax, PEG and extrusion forming agents.

5. High automation level as well as safe and reliable operating system.

6. The control system of the ceramics vacuum dewaxing sintering furnace is highly-automatic and humanized with data record and backup function.

7. The insulation box uses “sandwich” structure and high-strength CFC material that is not prone to deform after years of use.

8. Door of the insulation box is designed with special “step” design for improved insulation effect and extended service life of the insulation box.

9. Remote control, diagnosis and repair can be realized.

10. The electrode arc monitoring system can prevent serious damage to furnace shell caused by overheat and arc effect.

11. The function of resuming heating after short-time power failure can provide protection to the product in the furnace.

12. Persistent efforts of our R&D team in improving these integrated vacuum dewaxing and sintering furnaces have enabled Ruideer to obtain 13 patents up till now.