Send Message
Home > products > MIM Sintering Furnace >
2 Heating Zones Vacuum Sintering Furnace For MIM Stainless Steel

2 Heating Zones Vacuum Sintering Furnace For MIM Stainless Steel

2 Heating Zones Vacuum Sintering Furnace

MIM Vacuum Sintering Furnace

120 KVA MIM Sintering Furnace

Place of Origin:

China

Brand Name:

Ruideer

Certification:

CE; ISO9001; ISO14001; OHSAS 18001; GB/T29490

Model Number:

Customizable

Contact Us
Request A Quote
Product Details
Material:
Stainless Steel, Carbon Steel
Color:
White, Gray, Black, Blue
Power Rating:
120KVA, 150KVA, 480KVA
Effective Space:
Customizable
Payment & Shipping Terms
Minimum Order Quantity
1 set
Price
USD 93,000-77,000,000
Packaging Details
Special wooden box
Delivery Time
5-8 months
Payment Terms
L/C, T/T
Supply Ability
7 sets / month
Product Description

2 Heating Zones Vacuum Sintering Furnace For MIM Stainless Steel

For MIM stainless steel/Vacuum Sintering/Partial pressure sintering

 

TECHNICAL DETAILS

Here are just a few samples of the available specifications.
Many alternative dimensions and unlimited custom sulutions are available.


Model 4415

 

Usable Space 400*400*1500mm

Working temperature

1600℃(maximum working temperature)
1550℃(actual working temperature )

 

Pumping speed

The vacuum degree can reach 5Pa within 30min after the pump is started, and the limit vacuum value can reach 1Pa after pumping for 30min after reaching 5Pa

(After drying the furnace, under the empty furnace, clean and cold state.)

 

Leakage rate

≤3Pa/h

(Measuring the limit vacuum after drying the furnace, stop the operation of the pump group and start the test. Average within 3 hours in empty furnace, clean and cold state)

 

Cooling speed

 

Empty furnace. The cooling time of cooling temperature from 1450℃ down to 100℃ just cost less or equal 6 hours.(water temperature≤26℃, 2bar≤water pressure≤3bar)

 

Cooling speed

The inner furnace is equipped with rapid cooling fan and cooling water realize rapid cooling.
Heating rod material Graphite
Temperature control mode Two-zone temperature control independently
Heating up speed

 

Empty furnace heating up≤5℃

 

 

Heating power

 

300-320 KVA (the power configuration of the heating transformer is related to the heating speed, and the heating power can be automatically limited according to the actual use of the production).

 

UPS guarantee time

 

It can power the indicator lights and control the furnace when the power goes out,the time is more than or equal 80 minutes.
 
 

WHY BUY FROM US

2 Heating Zones Vacuum Sintering Furnace For MIM Stainless Steel 0 LONG TIME EXPERIENCE

Ruideer has gained over the years a great deal of experience and know-how in the field of technology concerned. Therefore, we are able to design and manufacture first-class vacuum sintering furnaces on customer's special request.

 

2 Heating Zones Vacuum Sintering Furnace For MIM Stainless Steel 1 MARKET LEADER

Our superior engineering with a keen sensitivity on customers' needs has granted RUIDEER FURNACES as the market leader for SINTERING FURNACES. We lead in the production quantity of many kinds of furnaces domestically.

 

2 Heating Zones Vacuum Sintering Furnace For MIM Stainless Steel 2LARGE SELECTION OF MODELS

Our furnaces are available in a wide range of models, making it possible to select the most suitable equipment for a particular application.

 

Send your inquiry directly to us

Privacy Policy China Good Quality Sinter HIP Furnace Supplier. Copyright © 2019-2024 sinterhipfurnace.com . All Rights Reserved.